General Contractor for Municipal Water Commission

Emergency Pump and Treatment System Installation
Cost
82,300.00

Performed emergency pumping, storage and treatment for over 700,000 gallons of petroleum contaminated water from water main break. Staged (5) 20,000 gallon storage tanks for implementation of 100,000 gallon oil-water separator system. Coordinated discharge of treated water to local sewerage authority. Monitored pump and treatment progress around the clock for 3 weeks. Installed automatic system to pump and treat water in the excavation after bulk of the discharge was contained.

Major Spill Cleanup Cooperative

Emergency Spill Response
Cost
67,475.00

Summary: Supplied labor and equipment to perform beach cleanup at major tourist sites along the Delaware River. Project entailed 12 men for 15 consecutive days, 16 hours per day.